Grades 3-8 & EOI Assessment Post-Code Correction


Report Window

Status

Currently Closed   

 

Open Window Span

June 4 - July 3

 

Overview

Districts will use the Accountability (A – F Report Card) application to complete Grades 3 – 8 and EOI assessment “Post-Code” record editing. In years past, record editing was completed through the testing vendor; this year it will be completed through Single Sign-On in the Accountability (A-F Report Cards) application.

The Correction Window will open on June 4 and close on July 3.

Districts will need to CERTIFY assessment demographics and testing status during the 30-day correction window for accurate calculation of their A-F report cards. After this window, assessment data will be submitted as is for A – F calculations.

 

Training
 

Report Guides/Manuals

 

Videos

 

back button iconBack to Student Information home

 

 

 

 

 

 

 

 

 

 

 

Downloads

Last updated on July 3, 2014